Copper, Moly & Gold

Copper, Moly & Gold

Multi-Asset Cu-Mo-Au Portfolio (79 $km^2$)

The Opportunity

Investment opportunity to acquire a JORC/KAZRC-compliant, multi-block mining portfolio featuring secured long-term licenses (up to 25 years). Target investment: US$30,000,000.

Resource Base

  • Oxidized Ores (Areas 2+3): 40.9M tonnes containing 112.4k tonnes Cu and 1,467 tonnes Mo. Formulated for premium cathode copper via SX-EW.
  • Sulfide Ores (Areas 1+2): 5.6M tonnes containing 27.4k tonnes Cu and 2,903 tonnes Mo for flotation concentrate.
  • Gold Zone (Area 4): 1,060+ thousand tonnes containing 646.12 kg Au.

Upside

Immediate growth potential to scale Area 1 resources 4–5x, double Area 2 reserves, and add 1 tonne of gold.

Project Overview: Copper, Molybdenum, and Gold Extraction

The project involves 4 licensed areas covering a total area of 79 $km^2$. The individual breakdown of the areas is:

  1. 35.01 $km^2$
  2. 24.85 $km^2$
  3. 12.20 $km^2$
  4. 6.68 $km^2$
  • Reporting Standards: Reserve and resource reports are compiled according to JORC / KAZRC standards using Datamine, Micromine, SURPAC, and QA/QC controls.

📊 Resources and Reserves (Total Across Areas)

The deposits are divided into three distinct ore profiles across the license plots:

1. Oxidized Ores (Areas 2 + 3)

  • Identified (Inferred): 18.5 million tonnes of ore (containing 73.6k tonnes of copper and 1,468 tonnes of molybdenum).
  • Total (+Indicated/Measurable): 40.9 million tonnes of ore (containing 112.4k tonnes of copper and 1,467 tonnes of molybdenum).

2. Sulfide Ores (Areas 1 + 2)

  • Identified (Inferred): 5.4 million tonnes of ore (containing 25.5k tonnes of copper and 2,735.4 tonnes of molybdenum).
  • Total (+Indicated/Measurable): 5.6 million tonnes of ore (containing 27.4k tonnes of copper and 2,903 tonnes of molybdenum).

3. Gold-Bearing Ores (Area 4)

  • Oxidized (Probable): 1,060.08 thousand tonnes of ore (containing 646.12 kg of gold).
  • Sulfide (Inferred): 0.44 thousand tonnes of ore (containing 2.15 kg of gold).

📈 Resource Growth Potential

  • Area 1: Potential to increase resources by 4–5 times.
  • Area 2: Potential to increase reserves by at least 2 times.
  • Area 4: Expected net growth of at least 1 tonne of gold.

📜 Mining Licenses Status

  • Area 3: License issued in May 2024 (valid for 25 years).
  • Area 4: License issued in December 2024 (valid for 10 years).
  • Area 2: License issued in December 2024 (valid for 15 years).
  • Area 1: License acquisition was planned for April 2025.

⚙️ Processing Technologies

  • Oxidized Ores: Sulfuric acid leaching (L) + solvent extraction and electrowinning (SX-EW) $\rightarrow$ produces cathode copper.
  • Sulfide Ores: Flotation enrichment (OF) $\rightarrow$ produces copper concentrate.

🌐 Market Context & Investment Focus

  • Global demand for copper exceeds current supply, with consumption growing annually.
  • In 2024, the price of cathode copper reached $10,000 per tonne.
  • Rich global deposits are depleting, shifting global extraction focus toward medium-grade deposits.

Total Targeted Investment: $30,000,000 (“Investment in the future. Resources for growth.”)

Ready to Learn More?

Contact our team for detailed geological reports, financial projections, and site visit arrangements.

Contact Us